At the beginning of the design process, there are many decisions that must be made regarding equipment, sinks, showers, biological safety cabinets (BSCs), and other primary barrier equipment, the configuration of the HVAC system, and contingencies based upon the facility design elements required by the agents that will be worked with or studied. Sustainability, maintainability, […]
Read More… from Five Design Considerations for Animal Laboratories